
November 9, 2026
System integrators, panel builders, and procurement teams rarely lose a prototype window because the design is wrong. They lose it when a machined bracket arrives three days late, when a critical bore is 0.012 mm out and the bearing will not press in. Or when the supplier cannot document the measurement that proves the part… Read More »

November 2, 2026
System integrators, panel builders, and procurement teams in heavy equipment rarely fail because they lack a control concept. They lose time—and budget—when the power supply overheats in an undersized compartment, when cable ducts cannot carry the required fill. Or when the cabinet frame flexes during transport and the door no longer seals.TPS Elektronik’s custom sheet… Read More »

October 26, 2026
System integrators, panel builders, and procurement teams in building automation rarely fail because they lack a control system design. They lose time—and operating budget—when the DIN rail power supply in a smart building control cabinet consumes more energy in no-load and part-load conditions than the entire control system it powers.TPS Elektronik’s DIN rail power supply… Read More »

October 19, 2026
System integrators, panel builders, and procurement teams in factory automation rarely lose production time because the PLC logic is wrong. They lose time—and uptime—when the 24V DC rail sags below 20V during a mains brownout, when an inductive load trips the power supply’s overcurrent protection. Or when the power supply documentation cannot support the CE… Read More »

October 12, 2026
System integrators, panel builders, and procurement teams in industrial automation rarely fail because they lack a control cabinet design. They lose time—and budget—when CISPR 11 emissions limits exceeded during formal certification, forcing costly filter redesigns and delaying factory acceptance testing.TPS Elektronik’s EMC laboratory services are built to reduce that risk: CISPR 11 pre-compliance testing for… Read More »

October 5, 2026
For system integrators, panel builders, and electrical engineers designing building automation and HVAC control systems, the power supply module is not just a component—it is the foundation of reliable, long-term operation. A single power failure can disable heating, ventilation, air conditioning, and critical building management functions, leading to occupant discomfort, energy waste, and costly service… Read More »

September 28, 2026
For system integrators, panel builders, and procurement teams developing next-generation electronics, the assembly of ultra-fine pitch and high-density BGA components is not a routine process—it is a precision manufacturing challenge that separates capable EMS partners from those who cannot deliver. A 0.4 mm pitch µBGA with 400 solder balls leaves no room for error. One… Read More »

September 21, 2026
For system integrators, panel builders, and electrical engineers designing conveyor and material handling control systems, the integration of distributed I/O and safety relays is not just about wiring components together—it is about creating a control architecture that is scalable, serviceable, and compliant with functional safety standards. A poorly designed control panel can lead to extended… Read More »

September 14, 2026
For system integrators, electrical engineers, and procurement teams designing high-frequency DC-DC converters, the transformer is not a commodity. It is the component that determines conversion efficiency, EMI performance, and power density. A transformer with excessive leakage inductance wastes energy, generates heat, and radiates electromagnetic interference that can fail EMC testing. In resonant converters and soft-switching… Read More »