{"id":19561,"date":"2026-11-23T08:00:00","date_gmt":"2026-11-23T07:00:00","guid":{"rendered":"https:\/\/tps-elektronik.com\/?p=19561"},"modified":"2026-11-04T09:28:40","modified_gmt":"2026-11-04T08:28:40","slug":"how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production","status":"publish","type":"post","link":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/","title":{"rendered":"How to Develop Automated Dispensing Equipment with a Custom 35V Power Supply for Stepper Motor Control, Compact Integration, and Reliable Series Production?"},"content":{"rendered":"<article class=\"blog-post\" lang=\"en-US\"><header>\n<p>Automated adhesive dispensing equipment needs more than a power supply that reads 35 V on a bench meter. The motor bus must support the dispensing cycle, fit the enclosure, recover predictably from faults, and remain reproducible when the machine moves into series production. For system integrators, panel builders, electrical engineers, and procurement teams, these requirements belong in one sourcing decision.<\/p>\n<p>This guide uses a nominal <strong>35v power supply<\/strong> as an engineering scenario for a stepper-driven dispensing machine. Ratings, dimensions, approvals, and production quantities must be established for your application. TPS Elektronik\u2019s additional services connect that specification with purchasing, material handling, and delivery planning.<\/p>\n<p><a class=\"cta-primary\" href=\"https:\/\/tps-elektronik.com\/en\/services\/additional-services\/\">Discuss your dispensing power supply and supply-chain requirements \u2192<\/a><\/p>\n<\/header><nav class=\"toc\" aria-label=\"Table of contents\">\n<h2 id=\"en-toc\">Table of contents<\/h2>\n<ol>\n<li><a href=\"#en-requirements\">Define the dispensing cycle before specifying the supply<\/a>\n<ol>\n<li><a href=\"#en-voltage-window\">Specify the complete voltage window<\/a><\/li>\n<\/ol>\n<\/li>\n<li><a href=\"#en-architecture\">\u00a0Choose the least complex architecture that meets the requirements<\/a><\/li>\n<li><a href=\"#en-load-sizing\">Size the stepper motor power supply from the operating profile<\/a>\n<ol>\n<li><a href=\"#en-regeneration\">Account for deceleration and fault recovery<\/a><\/li>\n<\/ol>\n<\/li>\n<li><a href=\"#en-compact-integration\">Design compact integration around heat, wiring, and service access<\/a><\/li>\n<li><a href=\"#en-validation\">Agree on acceptance evidence before ordering the pilot build<\/a><\/li>\n<li><a href=\"#en-market-requirements\">Separate component evidence from machine-level requirements<\/a><\/li>\n<li><a href=\"#en-series-production\">Turn an approved design into a controlled series supply<\/a>\n<ol>\n<li><a href=\"#en-variants\">Control variants at the final configuration step<\/a><\/li>\n<\/ol>\n<\/li>\n<li><a href=\"#en-rfq\">Send an RFQ that supports an engineering and commercial decision<\/a><\/li>\n<li><a href=\"#en-faq\">FAQ<\/a>\n<ol>\n<li><a href=\"#en-faq-35-36\">Can a 36 V supply replace a 35v power supply?<\/a><\/li>\n<li><a href=\"#en-faq-current\">How much output current does a stepper motor supply need?<\/a><\/li>\n<li><a href=\"#en-faq-custom\">When is a custom design justified?<\/a><\/li>\n<li><a href=\"#en-faq-services\">Which additional services should be included in the RFQ?<\/a><\/li>\n<\/ol>\n<\/li>\n<\/ol>\n<\/nav>\n<section>\n<h2 id=\"en-requirements\">1. Define the dispensing cycle before specifying the supply<\/h2>\n<p>Start with the motion profile: dispensing speed, acceleration, retract movement, holding periods, simultaneous axes, and restart behavior. A syringe plunger, auger, and positioning gantry can present different load patterns even when their motors have similar nameplate ratings. Record normal production, cleaning, setup, and worst-case operating sequences.<\/p>\n<p>A <strong>dispensing equipment power supply<\/strong> supports the drive electronics; it does not independently determine dispensing accuracy. Material viscosity, temperature, mechanical compliance, backlash, nozzle condition, and motion control also affect the result. Define an acceptable dispensing process separately from the electrical acceptance limits.<\/p>\n<h3 id=\"en-voltage-window\">Specify the complete voltage window<\/h3>\n<p>Explain why the machine needs 35 V. The reason may be an existing driver interface or an agreed operating point. Check the driver\u2019s recommended supply range and the limits of every connected component. Allow for supply tolerance, startup overshoot, wiring effects, and energy returned during deceleration. Nominal voltage alone cannot establish compatibility with a drive or capacitor.<\/p>\n<\/section>\n<section>\n<h2 id=\"en-architecture\">2. Choose the least complex architecture that meets the requirements<\/h2>\n<p>Compare three options before commissioning a <strong>custom dc power supply<\/strong>. An existing supply with an approved adjustment range may meet the requirement. A standard front end with a dedicated DC\/DC stage can separate the motor bus from other rails. A custom assembly becomes attractive when the electrical behavior, footprint, connectors, or production interface cannot otherwise be achieved.<\/p>\n<p>Evaluate total installed cost: engineering work, additional conversion losses, wiring, mounting, qualification, and service replacement. A lower component price can be offset by a second mounting plate or manual rework at every machine build. Conversely, a fully custom design may be difficult to justify for a small, uncertain forecast.<\/p>\n<p>Use a requirements review to select the architecture and identify unresolved measurements. TPS\u2019s overview of <a href=\"https:\/\/tps-elektronik.com\/en\/comprehensive-electronic-design-services-complete-solutions\/\">electronic design services and development handover<\/a> provides related context. The RFQ should state whether you need an adapted module, a custom assembly, or assistance comparing both.<br \/><img decoding=\"async\" class=\"alignnone size-full wp-image-19622\" src=\"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/11\/Power-Module-Scanning-Inspection-and-Delivery-1-1.jpg\" alt=\"Power Module Scanning, Inspection, and Delivery Scannen, Inspektion und Auslieferung von Leistungsmodulen\" width=\"1672\" height=\"941\" \/><\/p>\n<\/section>\n<section>\n<h2 id=\"en-load-sizing\">3. Size the stepper motor power supply from the operating profile<\/h2>\n<p>A stepper driver regulates winding current through switching. Motor phase current therefore should not be copied directly into the DC supply\u2019s current requirement. Determine the power drawn at the driver input across representative motion sequences, including coincident axis movements and the auxiliary loads sharing the rail.<\/p>\n<p>For early budgeting, record continuous demand, peak demand, peak duration, repetition rate, and acceptable bus excursion. Then validate the assumptions on hardware. The selected <strong>stepper motor power supply<\/strong> must handle the machine\u2019s cycle within its documented overload behavior and thermal derating. A generic power reserve does not replace this assessment.<\/p>\n<h3 id=\"en-regeneration\">Account for deceleration and fault recovery<\/h3>\n<p>Some motion events can return energy to the DC bus. Confirm whether the selected supply can absorb reverse energy; do not assume that an ordinary sourcing supply can do so. Local capacitance, a suitable clamp, or a braking arrangement may be needed, depending on the driver, load, and stopping sequence.<\/p>\n<p>Check the complete sequence when the controller disables the drive, a guard is opened, or input power is interrupted. The machine\u2019s safety functions require their own design assessment. The supply\u2019s overload, overvoltage, and restart behavior must be coordinated with the controller so that an electrical recovery cannot initiate an unintended dispensing movement.<\/p>\n<p>Document the driver-side minimum and maximum bus voltage during these events. Specify the measurement location and bandwidth; otherwise two suppliers may report results that look comparable but describe different conditions. Keep the driver manufacturer\u2019s recommended operating limits distinct from absolute maximum ratings throughout the review.<\/p>\n<p>For panel builders, agree on the delivered interface: a tested module, a wired subassembly, or a kit. Record who supplies mating connectors and who verifies final torque and polarity. These small responsibilities can otherwise become recurring production exceptions.<\/p>\n<\/section>\n<section>\n<h2 id=\"en-compact-integration\">4. Design compact integration around heat, wiring, and service access<\/h2>\n<p>A <strong>compact industrial power supply<\/strong> must be evaluated inside the intended enclosure. Connector clearance, cable bend radius, ventilation space, protective covers, and replacement access all count toward the installation envelope. Provide a mounting drawing and indicate whether dimensions describe the bare module or the fully connected assembly.<\/p>\n<p>Agree on ambient conditions, duty cycle, permitted airflow, mounting orientation, and nearby heat sources. Validate component temperatures after the enclosure reaches thermal equilibrium. If fanless operation is required, include it in the RFQ rather than assuming that an open-bench result applies to the finished machine.<\/p>\n<p>Route motor power and sensitive sensor signals with their interference risks in mind. Keep high-current paths controlled, provide appropriate local decoupling, and review the return-current layout. The official <a href=\"https:\/\/www.ti.com\/lit\/an\/slva959b\/slva959b.pdf\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Texas Instruments motor-driver layout guidance<\/a> explains relevant board-level considerations.<\/p>\n<p>Finally, define connector keying, polarity identification, fastening, and a service replacement procedure. A compact design delivers practical value when a technician can replace the approved assembly without modifying the machine harness or guessing which configuration was installed.<br \/><img decoding=\"async\" class=\"alignnone size-full wp-image-19617\" src=\"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/11\/Assembly-site-for-the-electrical-control-cabinet-of-an-automatic-dispensing-machine-2-1.jpg\" alt=\"Assembly site for the electrical control cabinet of an automatic dispensing machine Montageort f\u00fcr den Schaltschrank eines automatischen Dosierger\u00e4ts\" width=\"1672\" height=\"941\" \/><\/p>\n<\/section>\n<section>\n<h2 id=\"en-validation\">5. Agree on acceptance evidence before ordering the pilot build<\/h2>\n<p>Prototype success should produce a release decision that production can repeat. Specify electrical tests, system tests, acceptance limits, required records, and who approves deviations. Avoid an RFQ that asks only for a functional sample: a sample can run successfully without demonstrating performance at the actual installation limits.<\/p>\n<table><caption>Suggested validation scope to finalize with your engineering team<\/caption>\n<thead>\n<tr>\n<th scope=\"col\">Review area<\/th>\n<th scope=\"col\">Evidence to request<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<th scope=\"row\">Electrical behavior<\/th>\n<td>Output tolerance, ripple method, startup, load steps, and recovery under defined conditions.<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Machine integration<\/th>\n<td>Repeated dispensing cycles, simultaneous motion, stop\/restart behavior, and relevant sensor operation.<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Thermal behavior<\/th>\n<td>Results at the agreed enclosure conditions, orientation, airflow, and duty cycle.<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Production release<\/th>\n<td>Approved configuration, test procedure, acceptance limits, and revision-linked records.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Distinguish design qualification from routine production screening. Full environmental or EMC evaluation is not automatically performed on every shipped unit. Define which checks apply to every unit, which use sampling, and which are repeated after a material or design change. Include the expected handling of a failed result and the authority to release quarantined stock.<\/p>\n<p>For <strong>precision dispensing systems<\/strong>, verify the application outcome using the intended material and a documented measurement method. An electrically stable bus is one input to a stable process; it is not a substitute for dispensing validation. Agree on the machine configuration and environmental conditions used for that evaluation.<\/p>\n<p>Keep a reference sample and its approved settings linked to the release documentation. If a later delivery behaves differently, compare configuration, test conditions, and component revisions before changing the machine. Include the disposition of pilot units in the release decision: whether they may enter production, require rework, or remain engineering samples should be explicit. This prevents purchasing from treating an early sample as an automatically interchangeable series unit.<\/p>\n<\/section>\n<section>\n<h2 id=\"en-market-requirements\">6. Separate component evidence from machine-level requirements<\/h2>\n<p>US buyers should identify the control-panel and machinery evaluation route early. <a href=\"https:\/\/www.ul.com\/resources\/does-ul-certified-industrial-control-panel-certification-cover-equipment-it-controls\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">UL\u2019s guidance on industrial control panels<\/a> explains that panel certification does not cover the equipment it controls. Where applicable, discuss UL 508A and NFPA 79 with the responsible panel builder or evaluation body.<\/p>\n<p>For equipment intended for Germany, review the machine\u2019s electrical requirements and applicable EN standards with the responsible manufacturer. The <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/71256\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">IEC 60204-1 standard scope<\/a> is a useful starting reference; the relevant European adoption and project requirements still need confirmation. An approved power component does not establish conformity of the complete machine.<\/p>\n<p>Request evidence for the exact <strong>oem power supply<\/strong> configuration, including relevant approvals, operating conditions, and installation restrictions. Do not transfer a certificate from a similar product or assume that a changed enclosure, connector, or output setting is covered. Assign responsibility for reviewing the finished equipment\u2019s technical documentation.<\/p>\n<p><a class=\"cta-primary\" href=\"https:\/\/tps-elektronik.com\/en\/services\/additional-services\/\">Review documentation, sourcing, and pilot-delivery needs with TPS \u2192<\/a><br \/><img decoding=\"async\" class=\"alignnone size-full wp-image-19612\" src=\"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/11\/Compact-Automated-Electronic-Dispensing-Workstation-3-1.jpg\" alt=\"Compact Automated Electronic Dispensing Workstation Kompakte, automatisierte elektronische Dosierstation\" width=\"1672\" height=\"941\" \/><\/p>\n<\/section>\n<section>\n<h2 id=\"en-series-production\">7. Turn an approved design into a controlled series supply<\/h2>\n<p>The handover to <strong>custom electronics manufacturing<\/strong> should include an approved bill of materials, drawings, assembly instructions, test limits, and change-control responsibilities. Define which substitutions require engineering approval. An electrically similar replacement can still change thermal behavior, installation clearances, or the documentation needed for the target market.<\/p>\n<p>TPS\u2019s published additional-services scope includes purchasing support, warehousing, incoming goods inspection within material management, and fulfillment. For a dispensing project, the practical discussion is how these services fit the released assembly and your build schedule. Project-specific deliverables and commitments should be agreed in the quotation.<\/p>\n<p>Use an <a href=\"https:\/\/tps-elektronik.com\/en\/incoming-goods-inspection-report-inventory-control-electronics-fulfillment\/\">incoming inspection and fulfillment workflow<\/a> to define lot identification, inspection status, quarantine, and release. Reserve approved stock by project where required. Connect a change notice to the affected inventory so that old and new configurations do not become mixed in a machine build.<\/p>\n<p>Discuss forecast ownership, replenishment triggers, minimum order quantities, end-of-life notices, and liability for reserved materials. The related resources on <a href=\"https:\/\/tps-elektronik.com\/en\/comprehensive-electronic-design-services-supply-chain-solutions\/\">electronics supply-chain planning<\/a> and <a href=\"https:\/\/tps-elektronik.com\/en\/inventory-management-for-electronics-and-packaging-services\/\">inventory and protective packaging<\/a> can help frame that discussion.<\/p>\n<h3 id=\"en-variants\">Control variants at the final configuration step<\/h3>\n<p>If US and German machines use different cables, labels, or documentation, identify those differences explicitly. Late configuration can simplify stock only when the base unit remains approved and the final variant is checked before shipment. Include service spares and replacement instructions in the same revision structure.<\/p>\n<p>For returns, agree on identification, fault information, initial assessment, and the route for repair or replacement. Capture the machine revision and operating symptoms with the returned unit so that a supply issue can be separated from an installation or application issue.<\/p>\n<\/section>\n<section>\n<h2 id=\"en-rfq\">8. Send an RFQ that supports an engineering and commercial decision<\/h2>\n<p>A useful inquiry gives TPS enough information to identify the development questions and the additional services you need. Attach an existing specification or prototype data if available. Mark unknowns openly and identify who can resolve them; incomplete inputs are easier to manage than assumptions that become hidden contractual expectations.<\/p>\n<ul>\n<li><strong>Application:<\/strong> dispensing mechanism, driver model, motor data, axis count, and operating sequence.<\/li>\n<li><strong>Electrical targets:<\/strong> input source, nominal 35 V output, permitted voltage range, measured load profile, and auxiliary rails.<\/li>\n<li><strong>Installation:<\/strong> available envelope, mounting, connector interface, enclosure temperature, and cooling conditions.<\/li>\n<li><strong>Validation:<\/strong> target markets, acceptance criteria, required documentation, and responsibilities for machine evaluation.<\/li>\n<li><strong>Commercial scope:<\/strong> prototype quantity, pilot batch, forecast, desired milestones, and service-spare expectations.<\/li>\n<li><strong>Additional services:<\/strong> sourcing, incoming inspection, stock holding, kitting, packaging, and shipment destinations.<\/li>\n<\/ul>\n<p>Ask for development and tooling charges, unit-price assumptions, minimum quantities, testing scope, and logistics costs as separate items. Request a milestone-based proposal with explicit customer inputs and release gates. This makes competing offers comparable and allows purchasing to evaluate the installed solution rather than the power module alone.<br \/><img decoding=\"async\" class=\"alignnone size-full wp-image-19607\" src=\"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/11\/Engineer-Validates-Syringe-Pump-Drive-System-4-1.jpg\" alt=\"Engineer Validates Syringe Pump Drive System Ingenieur validiert Antriebssystem f\u00fcr Spritzenpumpe\" width=\"1672\" height=\"941\" \/><\/p>\n<\/section>\n<section>\n<h2 id=\"en-faq\">9. FAQ<\/h2>\n<h3 id=\"en-faq-35-36\">Can a 36 V supply replace a 35v power supply?<\/h3>\n<p>Only after the complete operating window is checked. Confirm adjustment approval, tolerances, transient peaks, and connected-component limits. Similar nominal voltages do not establish interchangeability.<\/p>\n<h3 id=\"en-faq-current\">How much output current does a stepper motor supply need?<\/h3>\n<p>Use the driver-input load profile, simultaneous loads, peak duration, and thermal conditions. The sum of motor phase-current ratings is not a sufficient sizing method.<\/p>\n<h3 id=\"en-faq-custom\">When is a custom design justified?<\/h3>\n<p>When available products cannot meet the verified electrical, mechanical, interface, or lifecycle requirements at an acceptable installed cost. Compare adaptation and custom development before committing.<\/p>\n<h3 id=\"en-faq-services\">Which additional services should be included in the RFQ?<\/h3>\n<p>Select the purchasing, inspection, inventory, configuration, packaging, and shipping steps your team needs. Agree on records, responsibilities, release conditions, and commercial terms for each selected service.<\/p>\n<\/section>\n<footer style=\"background: #2d5797; padding: 30px; border-radius: 14px; margin-top: 40px; color: #fff;\">\n<p style=\"margin: 0; line-height: 1.6;\"><strong>Planning a 35 V dispensing platform?<\/strong><br \/>Send TPS Elektronik your driver details, load profile, installation envelope, and production forecast.<br \/><a style=\"color: #fff; font-weight: 600; text-decoration: underline;\" href=\"https:\/\/tps-elektronik.com\/en\/services\/additional-services\/\">Request a project review and quotation for the required additional services \u2192<\/a><\/p>\n<\/footer><\/article>\n\n<style id=\"wpforms-css-vars-4659-block-f14037d6-1fa5-4029-bdde-024a813077fe\">\n\t\t\t\t#wpforms-4659.wpforms-block-f14037d6-1fa5-4029-bdde-024a813077fe {\n\t\t\t\t--wpforms-field-size-input-height: 43px;\n--wpforms-field-size-input-spacing: 15px;\n--wpforms-field-size-font-size: 16px;\n--wpforms-field-size-line-height: 19px;\n--wpforms-field-size-padding-h: 14px;\n--wpforms-field-size-checkbox-size: 16px;\n--wpforms-field-size-sublabel-spacing: 5px;\n--wpforms-field-size-icon-size: 1;\n--wpforms-label-size-font-size: 16px;\n--wpforms-label-size-line-height: 19px;\n--wpforms-label-size-sublabel-font-size: 14px;\n--wpforms-label-size-sublabel-line-height: 17px;\n--wpforms-button-size-font-size: 17px;\n--wpforms-button-size-height: 41px;\n--wpforms-button-size-padding-h: 15px;\n--wpforms-button-size-margin-top: 10px;\n\t\t\t}\n\t\t\t<\/style><div class=\"wpforms-container wpforms-container-full wpforms-block wpforms-block-f14037d6-1fa5-4029-bdde-024a813077fe wpforms-render-modern\" id=\"wpforms-4659\"><form id=\"wpforms-form-4659\" class=\"wpforms-validate wpforms-form wpforms-ajax-form\" data-formid=\"4659\" method=\"post\" enctype=\"multipart\/form-data\" action=\"\/en\/wp-json\/wp\/v2\/posts\/19561\" data-token=\"d309fe92e2d16b4065fcfefd18a9e9e8\" data-token-time=\"1795425013\"><noscript class=\"wpforms-error-noscript\">Please enable JavaScript in your browser to complete this form.<\/noscript><div id=\"wpforms-error-noscript\" style=\"display: none;\">Please enable JavaScript in your browser to complete this form.<\/div><div class=\"wpforms-field-container\"><div id=\"wpforms-4659-field_1-container\" class=\"wpforms-field wpforms-field-name\" data-field-id=\"1\"><fieldset><legend class=\"wpforms-field-label\">Name <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/legend><div class=\"wpforms-field-row wpforms-field-large\"><div class=\"wpforms-field-row-block wpforms-first wpforms-one-half\"><input type=\"text\" id=\"wpforms-4659-field_1\" class=\"wpforms-field-name-first wpforms-field-required\" name=\"wpforms[fields][1][first]\" aria-errormessage=\"wpforms-4659-field_1-error\" required><label for=\"wpforms-4659-field_1\" class=\"wpforms-field-sublabel after\">First<\/label><\/div><div class=\"wpforms-field-row-block wpforms-one-half\"><input type=\"text\" id=\"wpforms-4659-field_1-last\" class=\"wpforms-field-name-last wpforms-field-required\" name=\"wpforms[fields][1][last]\" aria-errormessage=\"wpforms-4659-field_1-last-error\" required><label for=\"wpforms-4659-field_1-last\" class=\"wpforms-field-sublabel after\">Last<\/label><\/div><\/div><\/fieldset><\/div>\t\t<div id=\"wpforms-4659-field_5-container\"\n\t\t\tclass=\"wpforms-field wpforms-field-text\"\n\t\t\tdata-field-type=\"text\"\n\t\t\tdata-field-id=\"5\"\n\t\t\t>\n\t\t\t<label class=\"wpforms-field-label\" for=\"wpforms-4659-field_5\" >Comment Name Message<\/label>\n\t\t\t<input type=\"text\" id=\"wpforms-4659-field_5\" class=\"wpforms-field-medium\" name=\"wpforms[fields][5]\" >\n\t\t<\/div>\n\t\t<div id=\"wpforms-4659-field_4-container\" class=\"wpforms-field wpforms-field-text\" data-field-id=\"4\"><label class=\"wpforms-field-label\" for=\"wpforms-4659-field_4\">Company <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"text\" id=\"wpforms-4659-field_4\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][4]\" aria-errormessage=\"wpforms-4659-field_4-error\" required><\/div><div id=\"wpforms-4659-field_2-container\" class=\"wpforms-field wpforms-field-email\" data-field-id=\"2\"><label class=\"wpforms-field-label\" for=\"wpforms-4659-field_2\">Email <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"email\" id=\"wpforms-4659-field_2\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][2]\" spellcheck=\"false\" aria-errormessage=\"wpforms-4659-field_2-error\" required><\/div><div id=\"wpforms-4659-field_3-container\" class=\"wpforms-field wpforms-field-textarea\" data-field-id=\"3\"><label class=\"wpforms-field-label\" for=\"wpforms-4659-field_3\">Comment or Message<\/label><textarea id=\"wpforms-4659-field_3\" class=\"wpforms-field-medium\" name=\"wpforms[fields][3]\" aria-errormessage=\"wpforms-4659-field_3-error\" ><\/textarea><\/div><div id=\"wpforms-4659-field_6-container\" class=\"wpforms-field wpforms-field-checkbox\" data-field-id=\"6\"><fieldset><legend class=\"wpforms-field-label wpforms-label-hide\" aria-hidden=\"false\">Checkbox <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/legend><ul id=\"wpforms-4659-field_6\" class=\"wpforms-field-required\"><li class=\"choice-1 depth-1 wpforms-selected\"><input type=\"checkbox\" id=\"wpforms-4659-field_6_1\" name=\"wpforms[fields][6][]\" value=\"I agree to the processing of my information for the purpose of creating a quote.\" aria-errormessage=\"wpforms-4659-field_6_1-error\" aria-describedby=\"wpforms-4659-field_6-description\" required  checked='checked'><label class=\"wpforms-field-label-inline\" for=\"wpforms-4659-field_6_1\">I agree to the processing of my information for the purpose of creating a quote.<\/label><\/li><\/ul><div id=\"wpforms-4659-field_6-description\" class=\"wpforms-field-description\">For information see Privacy.<\/div><\/fieldset><\/div><script>\n\t\t\t\t( function() {\n\t\t\t\t\tconst style = document.createElement( 'style' );\n\t\t\t\t\tstyle.appendChild( document.createTextNode( '#wpforms-4659-field_5-container { position: absolute !important; overflow: hidden !important; display: inline !important; height: 1px !important; width: 1px !important; z-index: -1000 !important; padding: 0 !important; } #wpforms-4659-field_5-container input { visibility: hidden; } #wpforms-conversational-form-page #wpforms-4659-field_5-container label { counter-increment: none; }' ) );\n\t\t\t\t\tdocument.head.appendChild( style );\n\t\t\t\t\tdocument.currentScript?.remove();\n\t\t\t\t} )();\n\t\t\t<\/script><\/div><!-- .wpforms-field-container --><div class=\"wpforms-recaptcha-container wpforms-is-turnstile\" ><div class=\"wpforms-turnstile\" data-sitekey=\"0x4AAAAAAFUTE-Rr1O4nxKnU\" data-action=\"FormID-4659\"><\/div><input type=\"text\" name=\"g-recaptcha-hidden\" class=\"wpforms-recaptcha-hidden\" style=\"position:absolute!important;clip:rect(0,0,0,0)!important;height:1px!important;width:1px!important;border:0!important;overflow:hidden!important;padding:0!important;margin:0!important;\" data-rule-turnstile=\"1\"><\/div><div class=\"wpforms-submit-container\" ><input type=\"hidden\" name=\"wpforms[id]\" value=\"4659\"><input type=\"hidden\" name=\"wpforms[time_token]\" value=\"1795425013.8d1c46fd0a369618669931762f8d037e1976a1fca79af6c1b1cb9c4b952e0082\"><input type=\"hidden\" name=\"page_title\" value=\"\"><input type=\"hidden\" name=\"page_url\" value=\"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/posts\/19561\"><input type=\"hidden\" name=\"url_referer\" value=\"\"><button type=\"submit\" name=\"wpforms[submit]\" id=\"wpforms-submit-4659\" class=\"wpforms-submit\" data-alt-text=\"Sending...\" data-submit-text=\"Submit\" aria-live=\"assertive\" value=\"wpforms-submit\">Submit<\/button><img decoding=\"async\" src=\"https:\/\/tps-elektronik.com\/wp-content\/plugins\/wpforms-lite\/assets\/images\/submit-spin.svg\" class=\"wpforms-submit-spinner\" style=\"display: none;\" width=\"26\" height=\"26\" alt=\"Loading\"><\/div><\/form><\/div>  <!-- .wpforms-container -->","protected":false},"excerpt":{"rendered":"<p>Automated adhesive dispensing equipment needs more than a power supply that reads 35 V on a bench meter. The motor bus must support the dispensing cycle, fit the enclosure, recover predictably from faults, and remain reproducible when the machine moves into series production. For system integrators, panel builders, electrical engineers, and procurement teams, these requirements\u2026 <a href=\"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/\">Read More &raquo;<\/a><\/p>\n","protected":false},"author":9,"featured_media":19622,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[57],"tags":[],"class_list":["post-19561","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog-content"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>TPS 35v Power Supply - TPS<\/title>\n<meta name=\"description\" content=\"Develop dispensing equipment with a custom 35v power supply, compact integration, testing, and coordinated production support.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TPS 35v Power Supply - TPS\" \/>\n<meta property=\"og:description\" content=\"Develop dispensing equipment with a custom 35v power supply, compact integration, testing, and coordinated production support.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/\" \/>\n<meta property=\"og:site_name\" content=\"TPS\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-23T07:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/11\/Power-Module-Scanning-Inspection-and-Delivery-1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Tang Marcus\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tang Marcus\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\\\/\"},\"author\":{\"name\":\"Tang Marcus\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/#\\\/schema\\\/person\\\/2c19fd053095d0c1ae253e8e62427b8c\"},\"headline\":\"How to Develop Automated Dispensing Equipment with a Custom 35V Power Supply for Stepper Motor Control, Compact Integration, and Reliable Series Production?\",\"datePublished\":\"2026-11-23T07:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\\\/\"},\"wordCount\":2119,\"image\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tps-elektronik.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Power-Module-Scanning-Inspection-and-Delivery-1-1.jpg\",\"articleSection\":[\"Blog Content\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\\\/\",\"url\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\\\/\",\"name\":\"TPS 35v Power Supply - TPS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tps-elektronik.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Power-Module-Scanning-Inspection-and-Delivery-1-1.jpg\",\"datePublished\":\"2026-11-23T07:00:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/#\\\/schema\\\/person\\\/2c19fd053095d0c1ae253e8e62427b8c\"},\"description\":\"Develop dispensing equipment with a custom 35v power supply, compact integration, testing, and coordinated production support.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\\\/#primaryimage\",\"url\":\"https:\\\/\\\/tps-elektronik.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Power-Module-Scanning-Inspection-and-Delivery-1-1.jpg\",\"contentUrl\":\"https:\\\/\\\/tps-elektronik.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Power-Module-Scanning-Inspection-and-Delivery-1-1.jpg\",\"width\":1672,\"height\":941,\"caption\":\"Power Module Scanning, Inspection, and Delivery Scannen, Inspektion und Auslieferung von Leistungsmodulen\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Develop Automated Dispensing Equipment with a Custom 35V Power Supply for Stepper Motor Control, Compact Integration, and Reliable Series Production?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/\",\"name\":\"TPS\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/#\\\/schema\\\/person\\\/2c19fd053095d0c1ae253e8e62427b8c\",\"name\":\"Tang Marcus\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TPS 35v Power Supply - TPS","description":"Develop dispensing equipment with a custom 35v power supply, compact integration, testing, and coordinated production support.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/","og_locale":"en_US","og_type":"article","og_title":"TPS 35v Power Supply - TPS","og_description":"Develop dispensing equipment with a custom 35v power supply, compact integration, testing, and coordinated production support.","og_url":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/","og_site_name":"TPS","article_published_time":"2026-11-23T07:00:00+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/11\/Power-Module-Scanning-Inspection-and-Delivery-1-1.jpg","type":"image\/jpeg"}],"author":"Tang Marcus","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Tang Marcus","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/#article","isPartOf":{"@id":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/"},"author":{"name":"Tang Marcus","@id":"https:\/\/tps-elektronik.com\/en\/#\/schema\/person\/2c19fd053095d0c1ae253e8e62427b8c"},"headline":"How to Develop Automated Dispensing Equipment with a Custom 35V Power Supply for Stepper Motor Control, Compact Integration, and Reliable Series Production?","datePublished":"2026-11-23T07:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/"},"wordCount":2119,"image":{"@id":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/#primaryimage"},"thumbnailUrl":"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/11\/Power-Module-Scanning-Inspection-and-Delivery-1-1.jpg","articleSection":["Blog Content"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/","url":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/","name":"TPS 35v Power Supply - TPS","isPartOf":{"@id":"https:\/\/tps-elektronik.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/#primaryimage"},"image":{"@id":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/#primaryimage"},"thumbnailUrl":"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/11\/Power-Module-Scanning-Inspection-and-Delivery-1-1.jpg","datePublished":"2026-11-23T07:00:00+00:00","author":{"@id":"https:\/\/tps-elektronik.com\/en\/#\/schema\/person\/2c19fd053095d0c1ae253e8e62427b8c"},"description":"Develop dispensing equipment with a custom 35v power supply, compact integration, testing, and coordinated production support.","breadcrumb":{"@id":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/#primaryimage","url":"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/11\/Power-Module-Scanning-Inspection-and-Delivery-1-1.jpg","contentUrl":"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/11\/Power-Module-Scanning-Inspection-and-Delivery-1-1.jpg","width":1672,"height":941,"caption":"Power Module Scanning, Inspection, and Delivery Scannen, Inspektion und Auslieferung von Leistungsmodulen"},{"@type":"BreadcrumbList","@id":"https:\/\/tps-elektronik.com\/en\/how-to-develop-automated-dispensing-equipment-with-a-custom-35v-power-supply-for-stepper-motor-control-compact-integration-and-reliable-series-production\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/tps-elektronik.com\/en\/"},{"@type":"ListItem","position":2,"name":"How to Develop Automated Dispensing Equipment with a Custom 35V Power Supply for Stepper Motor Control, Compact Integration, and Reliable Series Production?"}]},{"@type":"WebSite","@id":"https:\/\/tps-elektronik.com\/en\/#website","url":"https:\/\/tps-elektronik.com\/en\/","name":"TPS","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tps-elektronik.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tps-elektronik.com\/en\/#\/schema\/person\/2c19fd053095d0c1ae253e8e62427b8c","name":"Tang Marcus"}]}},"_links":{"self":[{"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/posts\/19561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/comments?post=19561"}],"version-history":[{"count":2,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/posts\/19561\/revisions"}],"predecessor-version":[{"id":19628,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/posts\/19561\/revisions\/19628"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/media\/19622"}],"wp:attachment":[{"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/media?parent=19561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/categories?post=19561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/tags?post=19561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}