{"id":19365,"date":"2026-11-17T09:00:00","date_gmt":"2026-11-17T08:00:00","guid":{"rendered":"https:\/\/tps-elektronik.com\/?p=19365"},"modified":"2026-10-29T08:52:26","modified_gmt":"2026-10-29T07:52:26","slug":"how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies","status":"publish","type":"post","link":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/","title":{"rendered":"How to Power Automated Test Sequences and Remote SCPI Control in Electronics Labs with TPS Programmable 150V DC Power Supplies?"},"content":{"rendered":"<article class=\"blog-post\" lang=\"en\"><header>\n<p>For system integrators, panel builders, and engineering-driven procurement teams, selecting a power supply for automated test sequences is not only about voltage and current ratings.<\/p>\n<p>It also involves the remote command interface, the stability of the setpoint at the device under test, the readback accuracy that the test sequence depends on, and whether the instrument can be integrated into a LabView, Python, or TestStand controller without bespoke driver development.<\/p>\n<p>The <a href=\"https:\/\/www.shop-tps.com\/shop\/category\/power-modules-dcdc-bidirectional-194\" target=\"_blank\" rel=\"noopener noreferrer nofollow\"><strong>EA-PSI 5200-10A<\/strong><\/a> is a microprocessor-controlled programmable DC power supply with <strong>90\u2013264VAC input<\/strong>, <strong>0\u2013200VDC \/ 0\u201310A \/ 640W<\/strong> auto-ranging output, <strong>&lt;30mV RMS ripple<\/strong>, and <strong>SCPI command language support<\/strong> alongside LabView VIs and Windows control software. This article explains how to use it as the programmable 150V-class source in an automated test sequence, and what to verify before integrating it into an ATE rack.<\/p>\n<p><a class=\"cta-primary\" href=\"https:\/\/tps-elektronik.com\/en\/services\/global-sales-partner-for-electronics\/\">Discuss your ATE power requirements with TPS \u2192<\/a><\/p>\n<\/header><nav class=\"toc\" aria-label=\"Table of Contents\">\n<h2 id=\"toc-en\">Table of Contents<\/h2>\n<ol>\n<li><a href=\"#en-why-scpi\">Why SCPI matters for automated test sequences<\/a>\n<ol>\n<li><a href=\"#en-scpi-standard\">SCPI on top of IEEE 488.2<\/a><\/li>\n<li><a href=\"#en-command-set\">The command set a test sequence actually needs<\/a><\/li>\n<\/ol>\n<\/li>\n<li><a href=\"#en-power-supply-fit\">How the EA-PSI 5200-10A fits a 150V ATE role<\/a>\n<ol>\n<li><a href=\"#en-output\">Output range, ripple, and readback<\/a><\/li>\n<li><a href=\"#en-interfaces\">USB, Ethernet, and the control software stack<\/a><\/li>\n<li><a href=\"#en-remote-sense\">Remote sensing and setpoint accuracy at the DUT<\/a><\/li>\n<\/ol>\n<\/li>\n<li><a href=\"#en-sequencing\">Sequencing and timing in an automated test<\/a>\n<ol>\n<li><a href=\"#en-power-up\">Power-up and power-down sequencing<\/a><\/li>\n<li><a href=\"#en-measurement\">Measurement synchronization and settling time<\/a><\/li>\n<\/ol>\n<\/li>\n<li><a href=\"#en-integration\">Integration checklist for an ATE rack<\/a><\/li>\n<li><a href=\"#en-specs\">Product specifications<\/a><\/li>\n<li><a href=\"#en-rfq\">RFQ checklist<\/a><\/li>\n<li><a href=\"#en-faq\">FAQ<\/a><\/li>\n<\/ol>\n<\/nav>\n<section id=\"en-why-scpi\">\n<h2>1. Why SCPI matters for automated test sequences<\/h2>\n<p>An automated test sequence is a sequence of instrument commands, not a sequence of manual dial adjustments. The controller must set a voltage, enable the output, wait for the DUT to settle, measure voltage and current, and repeat\u2014hundreds or thousands of times, without operator intervention.<\/p>\n<h3 id=\"en-scpi-standard\">1.1 SCPI on top of IEEE 488.2<\/h3>\n<p>SCPI (Standard Commands for Programmable Instruments) builds on the programming syntax of IEEE 488.2 to provide a common command set that can used over any hardware link\u2014USB, Ethernet, GPIB, or serial. The value for an ATE integrator is portability: the same test script structure can reused across instruments that implement SCPI, and the IEEE 488.2 common commands (reset, self-test, status operations) are defined consistently.<\/p>\n<p>The EA-PSI 5000 A series supports SCPI command language and supplied with LabView VIs and Windows control software. The programming details for the USB interface and the protocol are documented in the manufacturer\u2019s \u201cProgramming Guide ModBus &amp; SCPI\u201d.<\/p>\n<h3 id=\"en-command-set\">1.2 The command set a test sequence actually needs<\/h3>\n<p>A typical 150V ATE sequence uses a small subset of the full command tree. The essential commands are:<\/p>\n<ul>\n<li><strong>VOLTage &lt;value&gt;<\/strong> \u2014 sets the output voltage setpoint<\/li>\n<li><strong>CURRent &lt;value&gt;<\/strong> \u2014 sets the current limit<\/li>\n<li><strong>OUTPut ON | OFF<\/strong> \u2014 enables or disables the output<\/li>\n<li><strong>MEASure:VOLTage?<\/strong> \u2014 reads back the actual output voltage<\/li>\n<li><strong>MEASure:CURRent?<\/strong> \u2014 reads back the actual output current<\/li>\n<li><strong>SYSTem:ERRor?<\/strong> \u2014 checks for command errors before proceeding<\/li>\n<\/ul>\n<p>For a sequence that steps through multiple voltage points, the script sets VOLTage, waits for the settling time, then issues MEASure queries. The settling time must verified on the actual load, because the supply\u2019s load regulation time specification (&lt;1.5ms for this model) is measured at the terminals, while the DUT may add its own input capacitance and slow the response.<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-19457\" src=\"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/10\/150V-Power-Supply-ATE-Rack-SCPI-Automation-1-1.jpg\" alt=\"150V Power Supply ATE Rack SCPI Automation 150-V-Netzteil, ATE-Rack, SCPI-Automatisierung\" width=\"1920\" height=\"1079\" \/><\/p>\n<p><a class=\"cta-primary\" href=\"https:\/\/tps-elektronik.com\/en\/services\/global-sales-partner-for-electronics\/\">Explore TPS global sales partner services \u2192<\/a><\/p>\n<\/section>\n<section id=\"en-power-supply-fit\">\n<h2>2. How the EA-PSI 5200-10A fits a 150V ATE role<\/h2>\n<p>The EA-PSI 5200-10A is a 640W auto-ranging supply with a 0\u2013200VDC output. In a 150V ATE application, it not operated at its maximum voltage; it is operated at a comfortable point within the auto-ranging envelope, which leaves headroom for load transients and cable drop.<\/p>\n<h3 id=\"en-output\">2.1 Output range, ripple, and readback<\/h3>\n<p>At a 150V setpoint, the supply\u2019s &lt;30mV RMS ripple is a small fraction of the output, and the &lt;0.2% voltage accuracy supports a readback that the test sequence can trust without an external DMM for every point. The auto-ranging stage allows higher current at lower voltage or higher voltage at lower current within the 640W envelope, so the same instrument can cover 150V logic tests and lower-voltage, higher-current tests in the same rack.<\/p>\n<h3 id=\"en-interfaces\">2.2 USB, Ethernet, and the control software stack<\/h3>\n<p>The supply provides USB and Ethernet interfaces, and supplied with LabView VIs and Windows control software. For an ATE integrator, the practical path is usually one of three options:<\/p>\n<ul>\n<li><strong>LabView<\/strong>: use the supplied VIs or the SCPI driver, and wrap the sequence in a LabView state machine.<\/li>\n<li><strong>Python \/ PyVISA<\/strong>: send SCPI strings over the VISA resource, which is portable across USB and Ethernet.<\/li>\n<li><strong>TestStand or a custom C# controller<\/strong>: use the SCPI command set directly, or wrap the LabView VIs as a step.<\/li>\n<\/ul>\n<p>The 9 preset memory groups and the recall function are useful during sequence development: a known state can be recalled before each test step, which reduces the risk of a previous step leaving the output in an unexpected condition.<\/p>\n<h3 id=\"en-remote-sense\">2.3 Remote sensing and setpoint accuracy at the DUT<\/h3>\n<p>At 150V and 10A, the voltage drop in the test leads is not negligible. If the leads have 100m\u03a9 total resistance, a 10A load drops 1V\u2014far larger than the supply\u2019s accuracy specification. Remote sensing at the DUT terminals closes the regulation loop at the load, so the setpoint the test sequence commands is the voltage the DUT actually receives. Without remote sensing, the sequence is programming a voltage at the supply output, not at the device.<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-19452\" src=\"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/10\/SCPI-Command-Flow-Automated-Test-Sequence-Power-Supply-2.jpg\" alt=\"SCPI Command Flow Automated Test Sequence Power Supply Automatisierte Testsequenz f\u00fcr Stromversorgungen mittels SCPI-Befehlsabfolge\" width=\"1920\" height=\"1079\" \/><\/p>\n<\/section>\n<section id=\"en-sequencing\">\n<h2>3. Sequencing and timing in an automated test<\/h2>\n<p>Power supply sequencing is not unique to multi-rail systems. In a single-rail ATE sequence, the timing of output enable, settling, measurement, and output disable determines whether the test result is valid or noisy.<\/p>\n<h3 id=\"en-power-up\">3.1 Power-up and power-down sequencing<\/h3>\n<p>For a single supply powering a DUT with multiple internal rails, the order in which those rails come up may be defined by the DUT datasheet. The supply can implement this by setting VOLTage to the first rail value, enabling OUTPut, waiting, then stepping to the next value\u2014provided the DUT\u2019s internal regulators tolerate the sequence. For a DUT that requires a controlled ramp, the supply\u2019s programmable setpoint steps can be timed by the controller; the Keysight application notes on sequencing multiple modules describe the same principles of delay-based sequencing and fault-triggered shutdown.<\/p>\n<h3 id=\"en-measurement\">3.2 Measurement synchronization and settling time<\/h3>\n<p>The most common ATE sequencing error is measuring too early. After a VOLTage step, the supply\u2019s output recovers within its load regulation time, but the DUT\u2019s input capacitance and the cable inductance add an additional settling tail. The test sequence should wait for a settling time that has measured on the actual DUT, not assumed from the supply datasheet. The MEASure:VOLTage? and MEASure:CURRent? queries then return the actual values, and the sequence can compare them against limits before proceeding.<\/p>\n<p>For sequences that require faster throughput, the controller can overlap commands across multiple instruments\u2014for example, setting the next voltage point while the DMM measures the current point\u2014which is the standard technique for reducing ATE test time with multiple supplies.<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-19447\" src=\"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/10\/Remote-Sense-150V-Power-Supply-ATE-Accuracy-3-1.jpg\" alt=\"Remote Sense 150V Power Supply ATE Accuracy Genauigkeit der 150-V-Stromversorgung mit Remote-Sense-Funktion in ATE-Anwendungen\" width=\"1920\" height=\"1079\" \/><\/p>\n<p><a class=\"cta-primary\" href=\"https:\/\/tps-elektronik.com\/en\/services\/global-sales-partner-for-electronics\/\">Request an ATE integration review \u2192<\/a><\/p>\n<\/section>\n<section id=\"en-integration\">\n<h2>4. Integration checklist for an ATE rack<\/h2>\n<p>Before the supply mounted in the rack and the first SCPI script is run, the following items should be verified. This list is the difference between a sequence that runs unattended and one that requires an engineer to babysit every step.<\/p>\n<ul>\n<li><strong>Interface selection<\/strong>: USB for a single rack PC, Ethernet for a networked test cell. Confirm the VISA resource string and the instrument\u2019s IP configuration.<\/li>\n<li><strong>Remote\/Local state<\/strong>: The supply does not automatically enter remote mode on receiving a command; remote control must be explicitly activated, and a Local state can lock out remote commands. The sequence should include an explicit remote-enable step and a recovery path.<\/li>\n<li><strong>Protection settings<\/strong>: Set OVP just above the maximum test voltage and OCP just above the maximum test current. The supply\u2019s OVP, OCP, OPP, and overtemperature protections are adjustable and should be configured before the sequence starts.<\/li>\n<li><strong>Remote sense<\/strong>: Connect sense leads at the DUT terminals, not at the supply output, and verify the readback matches an external DMM at the DUT.<\/li>\n<li><strong>Settling time<\/strong>: Measure the actual settling time at the DUT for a representative voltage step, and use that value in the sequence.<\/li>\n<li><strong>Error handling<\/strong>: After each command block, query SYSTem:ERRor? and log the result. A silent command error is the most common cause of a \u201cmysterious\u201d test failure.<\/li>\n<li><strong>Documentation<\/strong>: Keep the SCPI command list, the interface configuration, and the timing diagram in the ATE documentation package, so the sequence can be maintained by someone other than its author.<\/li>\n<\/ul>\n<p>The <a href=\"https:\/\/tps-elektronik.com\/en\/element-testing-laboratories-safety-global-expansion\/\">element testing laboratories resource<\/a> and the <a href=\"https:\/\/tps-elektronik.com\/en\/case-studies\/quality-assurance-customer-case\/\">quality assurance customer case<\/a> describe how TPS supports test-lab integration and validation.<\/p>\n<\/section>\n<section id=\"en-specs\">\n<h2>5. Product specifications<\/h2>\n<table>\n<thead>\n<tr>\n<th>Parameter<\/th>\n<th>EA-PSI 5200-10A<\/th>\n<th>Typical manual bench supply<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Input<\/td>\n<td>90\u2013264VAC, 45\u201365Hz<\/td>\n<td>115\/230VAC selectable<\/td>\n<\/tr>\n<tr>\n<td>Output<\/td>\n<td>0\u2013200VDC \/ 0\u201310A \/ 640W, auto-ranging<\/td>\n<td>0\u201330V \/ 0\u20135A, fixed range<\/td>\n<\/tr>\n<tr>\n<td>Ripple<\/td>\n<td>&lt;30mV RMS<\/td>\n<td>Often unspecified<\/td>\n<\/tr>\n<tr>\n<td>Voltage accuracy<\/td>\n<td>&lt;0.2%<\/td>\n<td>0.5\u20131%<\/td>\n<\/tr>\n<tr>\n<td>Remote interface<\/td>\n<td>USB, Ethernet, SCPI, LabView VIs<\/td>\n<td>USB optional<\/td>\n<\/tr>\n<tr>\n<td>Preset memory<\/td>\n<td>9 groups<\/td>\n<td>2\u20134<\/td>\n<\/tr>\n<tr>\n<td>Remote sense<\/td>\n<td>Yes<\/td>\n<td>Usually no<\/td>\n<\/tr>\n<tr>\n<td>Typical use<\/td>\n<td>Automated test, ATE, lab automation<\/td>\n<td>Manual bench work<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The comparison shows where the specification matters for ATE: the remote interface, the readback accuracy, and the remote sense are the features that make unattended sequencing possible.<\/p>\n<\/section>\n<section id=\"en-rfq\">\n<h2>6. RFQ checklist<\/h2>\n<p>To streamline quotation and integration review for a <strong>150V power supply<\/strong> used in automated test sequences, provide the following:<\/p>\n<ul>\n<li><strong>Voltage and current range<\/strong>: Maximum test voltage, maximum load current, and whether the 150V point is continuous or stepped<\/li>\n<li><strong>Interface requirement<\/strong>: USB, Ethernet, GPIB, or a combination, and the controller environment (LabView, Python, TestStand, C#)<\/li>\n<li><strong>SCPI command coverage<\/strong>: Which commands the sequence will use, and whether any instrument-specific commands are required<\/li>\n<li><strong>Sequencing requirement<\/strong>: Number of voltage steps, settling time, and measurement points per step<\/li>\n<li><strong>Remote sense<\/strong>: Whether sensing at the DUT is required<\/li>\n<li><strong>Rack and cooling<\/strong>: Rack height, airflow, and ambient temperature<\/li>\n<li><strong>Documentation<\/strong>: SCPI programming guide, LabView VI library, and calibration certificate<\/li>\n<li><strong>Quantity and schedule<\/strong>: Single unit, multi-rack rollout, and delivery milestones<\/li>\n<\/ul>\n<p>Providing these details reduces clarification cycles. TPS\u2019s engineering team can support interface selection, sequence timing review, and integration planning as part of the RFQ process.<\/p>\n<p><a class=\"cta-primary\" href=\"https:\/\/tps-elektronik.com\/en\/services\/global-sales-partner-for-electronics\/\">Submit your 150V ATE power RFQ \u2192<\/a><\/p>\n<\/section>\n<section id=\"en-faq\">\n<h2>7. FAQ<\/h2>\n<div>\n<h3>Does the EA-PSI 5200-10A support SCPI over USB and Ethernet?<\/h3>\n<div>Yes. The EA-PSI 5000 A series supports SCPI command language and is supplied with LabView VIs and Windows control software. The supply provides USB and Ethernet interfaces, and the programming details are documented in the manufacturer\u2019s \u201cProgramming Guide ModBus &amp; SCPI\u201d.<\/div>\n<\/div>\n<div>\n<h3>What are the essential SCPI commands for a 150V test sequence?<\/h3>\n<div>The essential commands are VOLTage to set the output, OUTPut ON\/OFF to enable or disable the output, MEASure:VOLTage? and MEASure:CURRent? to read back the actual values, and SYSTem:ERRor? to check for command errors. The exact command tree should be verified against the programming guide supplied with the instrument.<\/div>\n<\/div>\n<div>\n<h3>Why is remote sensing important for a 150V ATE application?<\/h3>\n<div>At 150V and 10A, cable resistance can drop 1V or more, which is larger than the supply\u2019s accuracy specification. Remote sensing at the DUT terminals closes the regulation loop at the load, so the setpoint the sequence commands is the voltage the DUT actually receives.<\/div>\n<\/div>\n<div>\n<h3>Can the supply be sequenced for multi-rail power-up?<\/h3>\n<div>A single supply can step through voltage setpoints under SCPI control, and the controller can time the steps. For DUTs that require independent rails to come up in a defined order, multiple supplies or a multi-output system with sequencing capability is the more robust architecture. The sequencing principles are the same: delay-based ordering and fault-triggered shutdown.<\/div>\n<\/div>\n<div>\n<h3>What is the most common ATE integration error with this type of supply?<\/h3>\n<div>Measuring too early after a voltage step. The supply\u2019s load regulation time is specified at the terminals, but the DUT\u2019s input capacitance adds a settling tail. The sequence should use a settling time measured on the actual DUT, not a value copied from the datasheet.<\/div>\n<\/div>\n<\/section>\n<footer style=\"background: #2d5797; padding: 30px; border-radius: 14px; margin-top: 40px;\">\n<p style=\"color: #ffffff; font-size: 16px; line-height: 1.6; margin: 0;\"><strong>Next step:<\/strong> Send the test voltage range, the interface requirement, and the sequencing plan. TPS will confirm the supply configuration, the SCPI integration path, and the documentation package for your ATE rack. <a style=\"color: #ffffff; font-weight: 600; text-decoration: underline;\" href=\"https:\/\/tps-elektronik.com\/en\/services\/global-sales-partner-for-electronics\/\">Request your 150V ATE power review \u2192<\/a><\/p>\n<\/footer><\/article>\n\n<style id=\"wpforms-css-vars-4659-block-8b718a36-c49f-45e8-a221-9285914608e3\">\n\t\t\t\t#wpforms-4659.wpforms-block-8b718a36-c49f-45e8-a221-9285914608e3 {\n\t\t\t\t--wpforms-field-size-input-height: 43px;\n--wpforms-field-size-input-spacing: 15px;\n--wpforms-field-size-font-size: 16px;\n--wpforms-field-size-line-height: 19px;\n--wpforms-field-size-padding-h: 14px;\n--wpforms-field-size-checkbox-size: 16px;\n--wpforms-field-size-sublabel-spacing: 5px;\n--wpforms-field-size-icon-size: 1;\n--wpforms-label-size-font-size: 16px;\n--wpforms-label-size-line-height: 19px;\n--wpforms-label-size-sublabel-font-size: 14px;\n--wpforms-label-size-sublabel-line-height: 17px;\n--wpforms-button-size-font-size: 17px;\n--wpforms-button-size-height: 41px;\n--wpforms-button-size-padding-h: 15px;\n--wpforms-button-size-margin-top: 10px;\n\t\t\t}\n\t\t\t<\/style><div class=\"wpforms-container wpforms-container-full wpforms-block wpforms-block-8b718a36-c49f-45e8-a221-9285914608e3 wpforms-render-modern\" id=\"wpforms-4659\"><form id=\"wpforms-form-4659\" class=\"wpforms-validate wpforms-form wpforms-ajax-form\" data-formid=\"4659\" method=\"post\" enctype=\"multipart\/form-data\" action=\"\/en\/wp-json\/wp\/v2\/posts\/19365\" data-token=\"405fe2a5f860c6e1a3cb398d1b68d73d\" data-token-time=\"1794906178\"><noscript class=\"wpforms-error-noscript\">Please enable JavaScript in your browser to complete this form.<\/noscript><div id=\"wpforms-error-noscript\" style=\"display: none;\">Please enable JavaScript in your browser to complete this form.<\/div><div class=\"wpforms-field-container\"><div id=\"wpforms-4659-field_1-container\" class=\"wpforms-field wpforms-field-name\" data-field-id=\"1\"><fieldset><legend class=\"wpforms-field-label\">Name <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/legend><div class=\"wpforms-field-row wpforms-field-large\"><div class=\"wpforms-field-row-block wpforms-first wpforms-one-half\"><input type=\"text\" id=\"wpforms-4659-field_1\" class=\"wpforms-field-name-first wpforms-field-required\" name=\"wpforms[fields][1][first]\" aria-errormessage=\"wpforms-4659-field_1-error\" required><label for=\"wpforms-4659-field_1\" class=\"wpforms-field-sublabel after\">First<\/label><\/div><div class=\"wpforms-field-row-block wpforms-one-half\"><input type=\"text\" id=\"wpforms-4659-field_1-last\" class=\"wpforms-field-name-last wpforms-field-required\" name=\"wpforms[fields][1][last]\" aria-errormessage=\"wpforms-4659-field_1-last-error\" required><label for=\"wpforms-4659-field_1-last\" class=\"wpforms-field-sublabel after\">Last<\/label><\/div><\/div><\/fieldset><\/div>\t\t<div id=\"wpforms-4659-field_5-container\"\n\t\t\tclass=\"wpforms-field wpforms-field-text\"\n\t\t\tdata-field-type=\"text\"\n\t\t\tdata-field-id=\"5\"\n\t\t\t>\n\t\t\t<label class=\"wpforms-field-label\" for=\"wpforms-4659-field_5\" >or Email Comment<\/label>\n\t\t\t<input type=\"text\" id=\"wpforms-4659-field_5\" class=\"wpforms-field-medium\" name=\"wpforms[fields][5]\" >\n\t\t<\/div>\n\t\t<div id=\"wpforms-4659-field_4-container\" class=\"wpforms-field wpforms-field-text\" data-field-id=\"4\"><label class=\"wpforms-field-label\" for=\"wpforms-4659-field_4\">Company <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"text\" id=\"wpforms-4659-field_4\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][4]\" aria-errormessage=\"wpforms-4659-field_4-error\" required><\/div><div id=\"wpforms-4659-field_2-container\" class=\"wpforms-field wpforms-field-email\" data-field-id=\"2\"><label class=\"wpforms-field-label\" for=\"wpforms-4659-field_2\">Email <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"email\" id=\"wpforms-4659-field_2\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][2]\" spellcheck=\"false\" aria-errormessage=\"wpforms-4659-field_2-error\" required><\/div><div id=\"wpforms-4659-field_3-container\" class=\"wpforms-field wpforms-field-textarea\" data-field-id=\"3\"><label class=\"wpforms-field-label\" for=\"wpforms-4659-field_3\">Comment or Message<\/label><textarea id=\"wpforms-4659-field_3\" class=\"wpforms-field-medium\" name=\"wpforms[fields][3]\" aria-errormessage=\"wpforms-4659-field_3-error\" ><\/textarea><\/div><div id=\"wpforms-4659-field_6-container\" class=\"wpforms-field wpforms-field-checkbox\" data-field-id=\"6\"><fieldset><legend class=\"wpforms-field-label wpforms-label-hide\" aria-hidden=\"false\">Checkbox <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/legend><ul id=\"wpforms-4659-field_6\" class=\"wpforms-field-required\"><li class=\"choice-1 depth-1 wpforms-selected\"><input type=\"checkbox\" id=\"wpforms-4659-field_6_1\" name=\"wpforms[fields][6][]\" value=\"I agree to the processing of my information for the purpose of creating a quote.\" aria-errormessage=\"wpforms-4659-field_6_1-error\" aria-describedby=\"wpforms-4659-field_6-description\" required  checked='checked'><label class=\"wpforms-field-label-inline\" for=\"wpforms-4659-field_6_1\">I agree to the processing of my information for the purpose of creating a quote.<\/label><\/li><\/ul><div id=\"wpforms-4659-field_6-description\" class=\"wpforms-field-description\">For information see Privacy.<\/div><\/fieldset><\/div><script>\n\t\t\t\t( function() {\n\t\t\t\t\tconst style = document.createElement( 'style' );\n\t\t\t\t\tstyle.appendChild( document.createTextNode( '#wpforms-4659-field_5-container { position: absolute !important; overflow: hidden !important; display: inline !important; height: 1px !important; width: 1px !important; z-index: -1000 !important; padding: 0 !important; } #wpforms-4659-field_5-container input { visibility: hidden; } #wpforms-conversational-form-page #wpforms-4659-field_5-container label { counter-increment: none; }' ) );\n\t\t\t\t\tdocument.head.appendChild( style );\n\t\t\t\t\tdocument.currentScript?.remove();\n\t\t\t\t} )();\n\t\t\t<\/script><\/div><!-- .wpforms-field-container --><div class=\"wpforms-recaptcha-container wpforms-is-turnstile\" ><div class=\"wpforms-turnstile\" data-sitekey=\"0x4AAAAAAFUTE-Rr1O4nxKnU\" data-action=\"FormID-4659\"><\/div><input type=\"text\" name=\"g-recaptcha-hidden\" class=\"wpforms-recaptcha-hidden\" style=\"position:absolute!important;clip:rect(0,0,0,0)!important;height:1px!important;width:1px!important;border:0!important;overflow:hidden!important;padding:0!important;margin:0!important;\" data-rule-turnstile=\"1\"><\/div><div class=\"wpforms-submit-container\" ><input type=\"hidden\" name=\"wpforms[id]\" value=\"4659\"><input type=\"hidden\" name=\"wpforms[time_token]\" value=\"1794906178.f9d24b38648d9612fbbb65650a71de22270724cc43980526f8d8124119412166\"><input type=\"hidden\" name=\"page_title\" value=\"\"><input type=\"hidden\" name=\"page_url\" value=\"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/posts\/19365\"><input type=\"hidden\" name=\"url_referer\" value=\"\"><button type=\"submit\" name=\"wpforms[submit]\" id=\"wpforms-submit-4659\" class=\"wpforms-submit\" data-alt-text=\"Sending...\" data-submit-text=\"Submit\" aria-live=\"assertive\" value=\"wpforms-submit\">Submit<\/button><img decoding=\"async\" src=\"https:\/\/tps-elektronik.com\/wp-content\/plugins\/wpforms-lite\/assets\/images\/submit-spin.svg\" class=\"wpforms-submit-spinner\" style=\"display: none;\" width=\"26\" height=\"26\" alt=\"Loading\"><\/div><\/form><\/div>  <!-- .wpforms-container -->\n\n<style id=\"wpforms-css-vars-4659-block-8695555b-d22f-453b-ae9d-1e8b6e2ce969\">\n\t\t\t\t#wpforms-4659.wpforms-block-8695555b-d22f-453b-ae9d-1e8b6e2ce969 {\n\t\t\t\t--wpforms-field-size-input-height: 43px;\n--wpforms-field-size-input-spacing: 15px;\n--wpforms-field-size-font-size: 16px;\n--wpforms-field-size-line-height: 19px;\n--wpforms-field-size-padding-h: 14px;\n--wpforms-field-size-checkbox-size: 16px;\n--wpforms-field-size-sublabel-spacing: 5px;\n--wpforms-field-size-icon-size: 1;\n--wpforms-label-size-font-size: 16px;\n--wpforms-label-size-line-height: 19px;\n--wpforms-label-size-sublabel-font-size: 14px;\n--wpforms-label-size-sublabel-line-height: 17px;\n--wpforms-button-size-font-size: 17px;\n--wpforms-button-size-height: 41px;\n--wpforms-button-size-padding-h: 15px;\n--wpforms-button-size-margin-top: 10px;\n\t\t\t}\n\t\t\t<\/style><div class=\"wpforms-container wpforms-container-full wpforms-block wpforms-block-8695555b-d22f-453b-ae9d-1e8b6e2ce969 wpforms-render-modern\" id=\"wpforms-4659\"><form id=\"wpforms-form-4659\" class=\"wpforms-validate wpforms-form wpforms-ajax-form\" data-formid=\"4659\" method=\"post\" enctype=\"multipart\/form-data\" action=\"\/en\/wp-json\/wp\/v2\/posts\/19365\" data-token=\"405fe2a5f860c6e1a3cb398d1b68d73d\" data-token-time=\"1794906178\"><noscript class=\"wpforms-error-noscript\">Please enable JavaScript in your browser to complete this form.<\/noscript><div id=\"wpforms-error-noscript\" style=\"display: none;\">Please enable JavaScript in your browser to complete this form.<\/div><div class=\"wpforms-field-container\">\t\t<div id=\"wpforms-4659-field_5-container\"\n\t\t\tclass=\"wpforms-field wpforms-field-text\"\n\t\t\tdata-field-type=\"text\"\n\t\t\tdata-field-id=\"5\"\n\t\t\t>\n\t\t\t<label class=\"wpforms-field-label\" for=\"wpforms-4659-field_5\" >Comment Checkbox Email<\/label>\n\t\t\t<input type=\"text\" id=\"wpforms-4659-field_5\" class=\"wpforms-field-medium\" name=\"wpforms[fields][5]\" >\n\t\t<\/div>\n\t\t<div id=\"wpforms-4659-field_1-container\" class=\"wpforms-field wpforms-field-name\" data-field-id=\"1\"><fieldset><legend class=\"wpforms-field-label\">Name <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/legend><div class=\"wpforms-field-row wpforms-field-large\"><div class=\"wpforms-field-row-block wpforms-first wpforms-one-half\"><input type=\"text\" id=\"wpforms-4659-field_1\" class=\"wpforms-field-name-first wpforms-field-required\" name=\"wpforms[fields][1][first]\" aria-errormessage=\"wpforms-4659-field_1-error\" required><label for=\"wpforms-4659-field_1\" class=\"wpforms-field-sublabel after\">First<\/label><\/div><div class=\"wpforms-field-row-block wpforms-one-half\"><input type=\"text\" id=\"wpforms-4659-field_1-last\" class=\"wpforms-field-name-last wpforms-field-required\" name=\"wpforms[fields][1][last]\" aria-errormessage=\"wpforms-4659-field_1-last-error\" required><label for=\"wpforms-4659-field_1-last\" class=\"wpforms-field-sublabel after\">Last<\/label><\/div><\/div><\/fieldset><\/div><div id=\"wpforms-4659-field_4-container\" class=\"wpforms-field wpforms-field-text\" data-field-id=\"4\"><label class=\"wpforms-field-label\" for=\"wpforms-4659-field_4\">Company <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"text\" id=\"wpforms-4659-field_4\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][4]\" aria-errormessage=\"wpforms-4659-field_4-error\" required><\/div><div id=\"wpforms-4659-field_2-container\" class=\"wpforms-field wpforms-field-email\" data-field-id=\"2\"><label class=\"wpforms-field-label\" for=\"wpforms-4659-field_2\">Email <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"email\" id=\"wpforms-4659-field_2\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][2]\" spellcheck=\"false\" aria-errormessage=\"wpforms-4659-field_2-error\" required><\/div><div id=\"wpforms-4659-field_3-container\" class=\"wpforms-field wpforms-field-textarea\" data-field-id=\"3\"><label class=\"wpforms-field-label\" for=\"wpforms-4659-field_3\">Comment or Message<\/label><textarea id=\"wpforms-4659-field_3\" class=\"wpforms-field-medium\" name=\"wpforms[fields][3]\" aria-errormessage=\"wpforms-4659-field_3-error\" ><\/textarea><\/div><div id=\"wpforms-4659-field_6-container\" class=\"wpforms-field wpforms-field-checkbox\" data-field-id=\"6\"><fieldset><legend class=\"wpforms-field-label wpforms-label-hide\" aria-hidden=\"false\">Checkbox <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/legend><ul id=\"wpforms-4659-field_6\" class=\"wpforms-field-required\"><li class=\"choice-1 depth-1 wpforms-selected\"><input type=\"checkbox\" id=\"wpforms-4659-field_6_1\" name=\"wpforms[fields][6][]\" value=\"I agree to the processing of my information for the purpose of creating a quote.\" aria-errormessage=\"wpforms-4659-field_6_1-error\" aria-describedby=\"wpforms-4659-field_6-description\" required  checked='checked'><label class=\"wpforms-field-label-inline\" for=\"wpforms-4659-field_6_1\">I agree to the processing of my information for the purpose of creating a quote.<\/label><\/li><\/ul><div id=\"wpforms-4659-field_6-description\" class=\"wpforms-field-description\">For information see Privacy.<\/div><\/fieldset><\/div><script>\n\t\t\t\t( function() {\n\t\t\t\t\tconst style = document.createElement( 'style' );\n\t\t\t\t\tstyle.appendChild( document.createTextNode( '#wpforms-4659-field_5-container { position: absolute !important; overflow: hidden !important; display: inline !important; height: 1px !important; width: 1px !important; z-index: -1000 !important; padding: 0 !important; } #wpforms-4659-field_5-container input { visibility: hidden; } #wpforms-conversational-form-page #wpforms-4659-field_5-container label { counter-increment: none; }' ) );\n\t\t\t\t\tdocument.head.appendChild( style );\n\t\t\t\t\tdocument.currentScript?.remove();\n\t\t\t\t} )();\n\t\t\t<\/script><\/div><!-- .wpforms-field-container --><div class=\"wpforms-recaptcha-container wpforms-is-turnstile\" ><div class=\"wpforms-turnstile\" data-sitekey=\"0x4AAAAAAFUTE-Rr1O4nxKnU\" data-action=\"FormID-4659\"><\/div><input type=\"text\" name=\"g-recaptcha-hidden\" class=\"wpforms-recaptcha-hidden\" style=\"position:absolute!important;clip:rect(0,0,0,0)!important;height:1px!important;width:1px!important;border:0!important;overflow:hidden!important;padding:0!important;margin:0!important;\" data-rule-turnstile=\"1\"><\/div><div class=\"wpforms-submit-container\" ><input type=\"hidden\" name=\"wpforms[id]\" value=\"4659\"><input type=\"hidden\" name=\"wpforms[time_token]\" value=\"1794906178.f9d24b38648d9612fbbb65650a71de22270724cc43980526f8d8124119412166\"><input type=\"hidden\" name=\"page_title\" value=\"\"><input type=\"hidden\" name=\"page_url\" value=\"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/posts\/19365\"><input type=\"hidden\" name=\"url_referer\" value=\"\"><button type=\"submit\" name=\"wpforms[submit]\" id=\"wpforms-submit-4659\" class=\"wpforms-submit\" data-alt-text=\"Sending...\" data-submit-text=\"Submit\" aria-live=\"assertive\" value=\"wpforms-submit\">Submit<\/button><img decoding=\"async\" src=\"https:\/\/tps-elektronik.com\/wp-content\/plugins\/wpforms-lite\/assets\/images\/submit-spin.svg\" class=\"wpforms-submit-spinner\" style=\"display: none;\" width=\"26\" height=\"26\" alt=\"Loading\"><\/div><\/form><\/div>  <!-- .wpforms-container -->","protected":false},"excerpt":{"rendered":"<p>For system integrators, panel builders, and engineering-driven procurement teams, selecting a power supply for automated test sequences is not only about voltage and current ratings. It also involves the remote command interface, the stability of the setpoint at the device under test, the readback accuracy that the test sequence depends on, and whether the instrument\u2026 <a href=\"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/\">Read More &raquo;<\/a><\/p>\n","protected":false},"author":9,"featured_media":19457,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[57],"tags":[],"class_list":["post-19365","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog-content"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to Power Automated Test Sequences and Remote SCPI Control in Electronics Labs with TPS Programmable 150V DC Power Supplies? - TPS<\/title>\n<meta name=\"description\" content=\"150V programmable power supply with SCPI and LabView control for automated test sequences in electronics labs.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Power Automated Test Sequences and Remote SCPI Control in Electronics Labs with TPS Programmable 150V DC Power Supplies? - TPS\" \/>\n<meta property=\"og:description\" content=\"150V programmable power supply with SCPI and LabView control for automated test sequences in electronics labs.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/\" \/>\n<meta property=\"og:site_name\" content=\"TPS\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-17T08:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/10\/150V-Power-Supply-ATE-Rack-SCPI-Automation-1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1079\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Tang Marcus\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tang Marcus\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\\\/\"},\"author\":{\"name\":\"Tang Marcus\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/#\\\/schema\\\/person\\\/2c19fd053095d0c1ae253e8e62427b8c\"},\"headline\":\"How to Power Automated Test Sequences and Remote SCPI Control in Electronics Labs with TPS Programmable 150V DC Power Supplies?\",\"datePublished\":\"2026-11-17T08:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\\\/\"},\"wordCount\":2013,\"image\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tps-elektronik.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/150V-Power-Supply-ATE-Rack-SCPI-Automation-1-1.jpg\",\"articleSection\":[\"Blog Content\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\\\/\",\"url\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\\\/\",\"name\":\"How to Power Automated Test Sequences and Remote SCPI Control in Electronics Labs with TPS Programmable 150V DC Power Supplies? - TPS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tps-elektronik.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/150V-Power-Supply-ATE-Rack-SCPI-Automation-1-1.jpg\",\"datePublished\":\"2026-11-17T08:00:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/#\\\/schema\\\/person\\\/2c19fd053095d0c1ae253e8e62427b8c\"},\"description\":\"150V programmable power supply with SCPI and LabView control for automated test sequences in electronics labs.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\\\/#primaryimage\",\"url\":\"https:\\\/\\\/tps-elektronik.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/150V-Power-Supply-ATE-Rack-SCPI-Automation-1-1.jpg\",\"contentUrl\":\"https:\\\/\\\/tps-elektronik.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/150V-Power-Supply-ATE-Rack-SCPI-Automation-1-1.jpg\",\"width\":1920,\"height\":1079,\"caption\":\"150V Power Supply ATE Rack SCPI Automation 150-V-Netzteil, ATE-Rack, SCPI-Automatisierung\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Power Automated Test Sequences and Remote SCPI Control in Electronics Labs with TPS Programmable 150V DC Power Supplies?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/\",\"name\":\"TPS\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tps-elektronik.com\\\/en\\\/#\\\/schema\\\/person\\\/2c19fd053095d0c1ae253e8e62427b8c\",\"name\":\"Tang Marcus\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Power Automated Test Sequences and Remote SCPI Control in Electronics Labs with TPS Programmable 150V DC Power Supplies? - TPS","description":"150V programmable power supply with SCPI and LabView control for automated test sequences in electronics labs.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/","og_locale":"en_US","og_type":"article","og_title":"How to Power Automated Test Sequences and Remote SCPI Control in Electronics Labs with TPS Programmable 150V DC Power Supplies? - TPS","og_description":"150V programmable power supply with SCPI and LabView control for automated test sequences in electronics labs.","og_url":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/","og_site_name":"TPS","article_published_time":"2026-11-17T08:00:00+00:00","og_image":[{"width":1920,"height":1079,"url":"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/10\/150V-Power-Supply-ATE-Rack-SCPI-Automation-1-1.jpg","type":"image\/jpeg"}],"author":"Tang Marcus","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Tang Marcus","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/#article","isPartOf":{"@id":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/"},"author":{"name":"Tang Marcus","@id":"https:\/\/tps-elektronik.com\/en\/#\/schema\/person\/2c19fd053095d0c1ae253e8e62427b8c"},"headline":"How to Power Automated Test Sequences and Remote SCPI Control in Electronics Labs with TPS Programmable 150V DC Power Supplies?","datePublished":"2026-11-17T08:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/"},"wordCount":2013,"image":{"@id":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/#primaryimage"},"thumbnailUrl":"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/10\/150V-Power-Supply-ATE-Rack-SCPI-Automation-1-1.jpg","articleSection":["Blog Content"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/","url":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/","name":"How to Power Automated Test Sequences and Remote SCPI Control in Electronics Labs with TPS Programmable 150V DC Power Supplies? - TPS","isPartOf":{"@id":"https:\/\/tps-elektronik.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/#primaryimage"},"image":{"@id":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/#primaryimage"},"thumbnailUrl":"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/10\/150V-Power-Supply-ATE-Rack-SCPI-Automation-1-1.jpg","datePublished":"2026-11-17T08:00:00+00:00","author":{"@id":"https:\/\/tps-elektronik.com\/en\/#\/schema\/person\/2c19fd053095d0c1ae253e8e62427b8c"},"description":"150V programmable power supply with SCPI and LabView control for automated test sequences in electronics labs.","breadcrumb":{"@id":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/#primaryimage","url":"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/10\/150V-Power-Supply-ATE-Rack-SCPI-Automation-1-1.jpg","contentUrl":"https:\/\/tps-elektronik.com\/wp-content\/uploads\/2026\/10\/150V-Power-Supply-ATE-Rack-SCPI-Automation-1-1.jpg","width":1920,"height":1079,"caption":"150V Power Supply ATE Rack SCPI Automation 150-V-Netzteil, ATE-Rack, SCPI-Automatisierung"},{"@type":"BreadcrumbList","@id":"https:\/\/tps-elektronik.com\/en\/how-to-power-automated-test-sequences-and-remote-scpi-control-in-electronics-labs-with-tps-programmable-150v-dc-power-supplies\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/tps-elektronik.com\/en\/"},{"@type":"ListItem","position":2,"name":"How to Power Automated Test Sequences and Remote SCPI Control in Electronics Labs with TPS Programmable 150V DC Power Supplies?"}]},{"@type":"WebSite","@id":"https:\/\/tps-elektronik.com\/en\/#website","url":"https:\/\/tps-elektronik.com\/en\/","name":"TPS","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tps-elektronik.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/tps-elektronik.com\/en\/#\/schema\/person\/2c19fd053095d0c1ae253e8e62427b8c","name":"Tang Marcus"}]}},"_links":{"self":[{"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/posts\/19365","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/comments?post=19365"}],"version-history":[{"count":2,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/posts\/19365\/revisions"}],"predecessor-version":[{"id":19463,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/posts\/19365\/revisions\/19463"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/media\/19457"}],"wp:attachment":[{"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/media?parent=19365"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/categories?post=19365"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tps-elektronik.com\/en\/wp-json\/wp\/v2\/tags?post=19365"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}